EPC C by 2030: what a Thanet landlord should do this year

· 5 min read · Landlords

By , Co-founder — Construction & Operations

The Government confirmed it in January 2026: every private tenancy needs EPC C by 1 October 2030, with spending capped at £10,000 a property. Four years sounds like plenty. For an older Thanet terrace, it is about the right amount of time to do it properly.

For years the target moved. In January 2026 it stopped moving: the Government confirmed that every privately rented home in England and Wales must reach EPC C by 1 October 2030. An earlier proposal for new tenancies to comply from 2028 was dropped, so there is now a single date for everyone.

Four years sounds generous. For a modern flat already at D, it is. For a Victorian or Edwardian terrace in Margate, Cliftonville or Ramsgate, with solid walls, original sash windows and an old boiler, it is about the right amount of time to do the work in a sensible order, use reliable trades and avoid paying rush prices in 2029 when every other landlord is doing the same.

What has been confirmed

  • The standard: EPC C, measured on the new EPC's fabric performance metric plus either its heating system or smart readiness metric (the landlord chooses which)
  • The deadline: 1 October 2030, for all private tenancies
  • The cost cap: £10,000 per property, or 10% of the property's value if that is lower, with no inflation increase before 2030
  • Spending that counts: qualifying work from 1 October 2025 counts towards the cap
  • Exemptions: including the cost cap, works that would harm the property, and solid wall insulation, each lasting ten years once registered
  • Penalties: the maximum fine per breach rises to £30,000
  • Not covered: short-term holiday lets

Why the order of works matters

The new EPC rewards the fabric of the building first. That means insulation, draught-proofing and windows tend to do more for the rating than a new boiler on its own, and it means getting them in the right order: there is no point fitting a heat pump sized for a leaky house, then insulating it the year after. A plan that starts with the fabric, then heating, then controls is usually cheaper and more effective than a series of separate jobs.

Damp is the other reason to plan. Insulation fitted to a wall that is already damp, or a house sealed up without ventilation, can create the mould problems landlords are now expected to deal with quickly. Fix the cause of any damp first, then insulate, then ventilate.

What to do this year

  • Find the current EPC for each property and read the recommendations page, not just the letter
  • Note what each property has now: wall type, loft insulation depth, windows, boiler age, heating controls
  • Get a plan for each property that puts the works in order and estimates the cost against the cap
  • Book the work that is cheap and effective first: loft insulation, draught-proofing, heating controls
  • Keep every invoice. Work from 1 October 2025 counts towards the cap, and you will need to prove it if you apply for an exemption
  • Use accredited assessors for the EPC itself and registered installers for the work

Where we fit in

We do not carry out EPC assessments; that is a job for an accredited energy assessor. What we do is walk the property, check its condition, record any damp, and turn the EPC recommendations into a practical order of works with realistic costs, then check the trades you appoint and the work they do. Landlord Ready covers that for £295 a property, or £245 each for three or more.

Sources and further reading

Checked against the sources below on 4 October 2026.

This article is general guidance, not advice about your particular property. Detailed regulations were still being finalised when it was written; check the sources below before committing to major work.

The short version

  • Every private tenancy needs EPC C by 1 October 2030, confirmed by the Government on 26 January 2026
  • The most you can be required to spend is £10,000 per property, or 10% of its value if lower
  • Qualifying work done from 1 October 2025 counts towards that cap, so planned work now is not wasted
  • Older solid-wall homes need the longest run-up: plan the order of works this year, spend over the next three

Need this checked?

The first call is free and genuinely diagnostic. If your paperwork is already in decent shape, we'll tell you.

Book a free consultation

Related reading

  • Landlords · 5 min read

    Damp and mould: what Awaab's Law will mean for private landlords

    Social landlords now have fixed deadlines to investigate and fix damp and mould. The same law can be extended to private renting, with the date still to be set. The landlords who will find it easy are the ones keeping written records now.

  • Construction · 3 min read

    No business is too small for a proper plan: lessons from a fatal ladder strike

    A sole trader decorator has been sentenced after his 24-year-old stepson was electrocuted when a ladder touched an overhead power line. What HSE found, why RAMS matter for one-person businesses too, and six questions every plan should answer.

  • Homeowners · 6 min read

    A £200,000 bill for a wall that should never have come down

    Supporting timbers and steels came out while chimney breast works were still open, with no temporary propping. The gable wall collapsed. The builder was sentenced — but because his public liability cover was invalid, the homeowner paid £200,000 to rebuild their own house.